Home » Case Studies » SIPS Panel ExtensionSIPS Panel ExtensionMay 2023Coventry Our In House Trained Team Carried Out This Installation Of Ground Screws For This Amazing Sips Kitchen Extension And Decking Area.The challengeWith restricted access to the site and a tight timeframe for the build to be completed, we were contacted by our client to see if we could provide a cost effective solution for their build.The solutionWith our experienced customer service team guiding our client through the process, we were able to advise on best practice, carry out a compression load test to satisfy building control and to go on and complete our installation within a morning. With no time required for our Ground Screws to become load bearable, the rest of the build was able to carry on as soon as we had left site allowing this amazing build to be watertight within a matter of days from breaking ground.